Demolition began with the removal of an enclosed catwalk that meandered throughout the building.
The building has significant historical value that we wanted to preserve. We are restoring the original entry vestibule that was demolished during a previous renovation.
All of the marble being removed from the front lobby is being saved and will become a recycled material elsewhere in the project.

Discarded materials are being recycled as much as possible. During demolition there were four different
Documenting and presenting this exciting process is very important to us. Check back soon for weekly progress updates.
dumpsters on site in order to separate materials for recycling.
The catwalk was a part of the original building design as a security measure for the Post Office. Its removal allowed for a great deal of natural light to enter the building, which will help to cut down on energy costs.
Groundbreaking was on June 26, 2002. Everyone in the Doty & Miller Staff got to take a swing with a ceremonial gold sledge hammer to knock down the first wall.